Hydrocarbon Equipment
-
HC-3 Hydrocarbon
• Liquid and vapour recovery with automatic changeover
• Self discharging and Hot Gas/Cool Gas discharge switch
• On board refrigerant storage facility – capacity 250g
• Automatic high and low pressure safety switches and manual low pressure override switch
• 110V and 240V models available
• Compressor protection, HP switch plus thermal overload -
HC-Air Fan Ventilation Module
• The HC-Air fan module is an essential service accessory to be used when transferring hydrocarbon refrigerant and should feature in the risk assessment process
• Commutated motor
• 5 m hard wired mains lead with moulded plug
• Non sparking thermoplastic fan blade for increased performance and reduced noise level
• Mains cable storage
• Robust painted steel casework
Join our mailing list
CONTACT US TODAY TO DISCUSS YOUR REQUIREMENTS
No matter what your requirements, JAVAC can tailor a solution to fit your needs. Talk to JAVAC.